Skip to Content

Error: Cost Element not created for Non Valuated material

We are creating process order for FG 10000011.

When we clicked on "detemine cost" icon, it gave error Messages were issued when costs were calculated (see log).

When we went into log, it showed followng error: Item 00006 : Cost element does not exist in CO area D000 for 07.05.2012

Item 00006 is a scrap output with FG 10000011. Being scrap, it is non valuated material and hence there is no accounting and costing view.

Our issue is: Why its asking for cost element even if there is no valuation class. Its not specifying cost element name in the error.

Other information:

We tried same process for FG 10000007. This FG is also having OTHER scrap (as output). This scrap is also non valuated. But it does not give any error.

Please let me know what could be the issue.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on May 07, 2012 at 08:54 AM

    Removed "Relevant to costing" tick from BOM. Error solved

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.