Parallel Modification in Materials

Dear Gurus.

Is there any solution to when user A has open a material X user B can create an ISO or create a production order and do the confirmation.

As currently system does not allow. is there any solution if so please guide me , if not can you give explain me why ?

Regards

Saad Nisar.

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 07, 2012 at 05:25 AM

    Let say user A is not accessing MM02 transaction but he is creating an Outbound delivery for material X and at the same time User B is doing the confirmation of material X on production order.


    System still stop and throw a message that User A has opened the material X.

    As our daily production on material X is about 100ton/day and if the user A has opened a material while creating an ISO, or delivery user B is restricted which delays user B for creating Packing list and doing dispatch.

    Add a comment
    10|10000 characters needed characters exceeded

    • Well since it's MTO there's nothing much you can do, the processes are internlinked, so SAP locks the tables to avoid inconsistenties.

      You can post the confirmations in the background, but first you have to mark them to be posted in the background using transaction code CO1V. This transaction code will NOT lock the table data so you can post your outbound delivery etc. Then setup a background job for CORUPROC1 to post the confirmations during the night.

      Use case 1. in the following post in th thread I explained

      http://scn.sap.com/message/11053073#11053073

      Message was edited by: Jeevan S.

  • Posted on May 07, 2012 at 05:18 AM

    dear,

    as far as i know it is not possible because when user A is having say, MM02, the relevant tables records are LOCKED

    regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 07, 2012 at 05:20 AM

    You should be able to create production order and do confirmation when the material is open. Because Production order and confirmation is transactional data while Material is Master data.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on May 07, 2012 at 05:20 AM

    Saad Nisar,

    As material master have many parameters which affect transaction , and hence SAP have this locking facility.

    consider a example , one user is setting a material plant status for material as Non production relevant and other one is creating a production order, so it doesnt justify.

    Appreciate if you provide details , why do you want to have such function activate in system, the exact requirement and may be Experts here can suggest some solution or work around.

    Hope it will help you.

    Thanks

    Ritesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 07, 2012 at 05:50 AM

    Thank you all.

    Thread has been closed.

    Points has been given.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.