Project or project branch does not contain any planning elements

Project or project branch does not contain any planning elements

Message no. KPN082

Diagnosis

The project or project branch to be processed does not contain any planning elements.

System Response

The system cannot create the costing.

Procedure

Select the WBS elements you want to cost as planning elements.

Note that costing is not possible for plan-integrated WBS elements, even though they are planning elements.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on May 04, 2012 at 06:09 PM

    The purpose of integrated planning indicator is integration with controlling cost centre accounting etc- this can be unticked and it does not mean statistical unless you select statistical - then it would be statistical and useless for quotation

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.