plant stock .......is there     while running the mrp for  project stock   how these stocks will link    ??

plant stock is  100            but project stock  is   zero    while running mrp for  project stock(material with wbs)  how  the plant stock is consider in mrp running

pls give me some suggestion

advance thanks

ramana

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

If the requirement is for project stock, system will never consider 'plant stock' as available stock. Maximum, you can provide report to the user before he convert PR into PO where user can see the available plant stock and transfer the same to the required project.