Hi

I want to set up some cost centers in a hierachy.

In the hierachy, i have the main compnay AB

Under AB, there 8 different branches which are HO, ACC, TEM, KUM, TAM, SUN, ZC and QW

Under these 8 branches are two subunits under these brances. These subunits under each branch are the main cost centers which form the active GL accounts in my chart of accounts.

How do i set up these cost centers in the hierachy under cost accounting in financials

What is the role of the Dimensions in the cost accounting?

Thank

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Apr 30, 2012 at 03:35 PM

    Hi,

    Although there is only one level for cost center per dimension, you can use sort code to create your hierarchy. Dimension is the same as you other setup if you have use it already.

    Thanks,

    Gordon

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.