Skip to Content
author's profile photo Former Member
Former Member

Vendor Evaluation

Dear All, I am in the process of configuring vendor evaluation to cater my client's requirement. However, I have an issue with the logic which is given to me. That is how to configure that par in the system. I have given a sample logic below. E.g Vendor A has given the lowest price. so he must be given 60% Vendor B price variance compare to vendor A is 10% (his price for a material is 110) then he must be given 30% Logic Weight

Deviation from the least score

least score (lowest price) = 100%

vendor score (system rating) = 100% Score = 100% 60% vendor score (system rating) = 100% - 110% 100% < score <=110% 55% Pls guide me how to configure the logic part in the system. I am clear about maintaining Weightages for main and sub criteria and it is already done. Tks Sujith
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Apr 27, 2012 at 05:19 AM

    Dear All,

    Pls help me on this

    Tks

    Sujith

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 27, 2012 at 05:44 AM

    Hi

    The vendor Evaluation depends upon no of parameters, like Quality, Cost,Delivery .

    In your case you are considering cost/price as a parameter and your client wants the weight for price parameter to calculate total vendor evaluation.

    Ex: Below is just example.

    Weigt for Quality : 30%

    Weight for delivery: 30%

    Weight for price: 40%

    Total: 100%

    so while considering the weight for price parameter as per your requirement is as below

    If price is lowest among all suppliers then weight is :60%

    If price is increased by 10 % (as you mentioned for vendor B) then it is 55%

    whether you consider weight as vendor evaluation?

    To clarify more on this can you provide some more details.

    Check the link:

    http://scn.sap.com/thread/1376767

    http://help.sap.com/scenarios_bus2004/helpdata/en/34/3ef24087528431e10000000a1550b0/content.htm

    Also see the link for Configuration work:

    http://scn.sap.com/thread/884582

    http://scn.sap.com/thread/2021620

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.