Release Strategy - PR

Hi,

We have done some changes to our release strategy. After the change when we make amendment to a old PR that was released with the previous strategy, we encountered the following inconsistencies:

If amendment is in Item 10, any kind of changes, be it text or value increases/decreases the effected release will be cancelled.

However if changes is in Item 20, the effected release is cancelled only if the change is on the value of the PR.

Thanks and Regards

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    Posted on Apr 26, 2012 at 09:19 AM

    this is probably because only the release char value of the first line is passed to release comm structure and for money value it is the cumulative one

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Jürgen Lins

      What has changed:

      1. Created new strategy for the following changes

      2. Reduced approver from two to one.

      3. Release amount changed; example from >50000 - 20000 SGD to >0 SGD

      4. Added multiple purchasing groups to some of the release strategy.

      Example: release strategy 01 has Purch Groups: Team 1, Team 2, Team 3

      For the old strategy, I set it release amount to 0.

      Thanks.

  • Posted on Apr 26, 2012 at 09:18 AM

    Hi,

    in PR, release strategy is different for each and every line item.

    please check the characteristics for each strategy of 1st line item and second line item.

    Regards.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 26, 2012 at 09:51 AM

    Hi,

    Please check values of characteristics in classification for respective release strategies.

    Thanks,

    Amit Karanjkar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 26, 2012 at 11:39 AM

    In SPRO in Release Indicator under "Changeablity of Purchasing Document " which option do you have selected ?

    Please select option 4 "Changeable, new release in case of new strat. or val. change"

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.