Material approval, going into Reservation after production order confirmation

Dear all,

My client requirement is as follows once Production is confirmed(final confirmation) the material will move to Reservation,they need

a check point or after stores approval it should move to reservation.please help me on this scenario.Is there any option

regards

vasanth

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Apr 27, 2012 at 04:39 AM

    Hello,

    Please check the following:

    Depending on the settings in the material master and the bill of material, or the settings and assignments in the project system, the system generates for components with this item category a reservation once it is reservation type it is moved

    Please look into the following:

    http://help.sap.com/saphelp_46c/helpdata/en/d7/b8853488601e33e10000009b38f83b/frameset.htm

    regards

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.