Skip to Content

What is Time-Based Fields for Cost Elements, Cost Centers

Dear Gurus,

Could you please let me know,

1. What is Time based fields for Cost elements as well as cost centers?

2. what is the purpose of Indicator "Historically relevant" ?

In which cases, we will use them? I read the help.sap documents but unable to get clarified.

Regards,

Sridhar.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Apr 25, 2012 at 01:37 PM

    Hi,

    For cost elements, all fields in CSKB table are time-dependent. For cost centres: all fields in CSKS + CSKT (description) tables are time-dependent.

    What indicator do you have in mind? In which screen?

    Regards,


    Eli

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.