on 04-24-2012 1:51 PM
Hello All,
we are into SRM 7.0 classic scenario, and ECC 6.0. created a shopping cart in Quality system, PR has been created in the backed quality system, PO has created. till this point everything is fine. as soon i create the PO in the backend system, in SRM SC related document tab, the confirmation number is updating even though the confirmation is not created.
When we analyzed the issue, we found that system is updating the PO from Production system. we checked all the customization settings everything looks fine, but this is a serious issue. can any one through lights on this issue.
Regards,
Santhosh
Hi Santosh,
I hope ALE port selection is pointing wrong. Check the ports info in WE21 (both ECC & SRM systems), This is mainly because of port only.
Alternatively, also check with BASIS for the following info.
Did basis team ran the BDLS in both SRM & ECC? Run the BDLS in ECC and SRM by selecting old lgoical system and new logical system names.
Regards,
Krish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.