Replication and Transport Datasource

Dear All,

In BW 7, I notice that when we collect the objects for transport, system will also add one object with type 'Datasource' in the transport request.

Does this mean that we no longer need to replicate datasource ?

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Apr 23, 2012 at 07:04 PM

    Hi,

    Check the Grouping and Collection Mode. If Grouping is In Data Flow Before/Afterwards/Before and Afterwards and Collection mode is Automatic, system will collect the necessary objects will be automatically collected by the system.

    Hope this helps you

    Regards
    Chandu

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 24, 2012 at 08:26 AM

    No, you have to replicate the datasource. with the replication action, the datasource along with transfer structure will be overwritten the existing datasource.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Apr 24, 2012 at 01:28 PM

    Hi,

    Yes.. At the time of collecting the object into the Transport Request it will be add with type "Data Source Active version".

    As per the procedure, we need to to do the BW transports after the completion of R/3 transports in the landscape like DEV > QA > PROD.

    If the scrnario is in QA system:

    If the R/3 transports completed before the BW transports, It is not required to Replicate the datasource seperatly. Why because, as part of the import job the datasource will be replicated and active the data source in BW.

    you can see this example/Scenario:

    Some times the transport got failed with the error message the "Data Source" does not exit in source,when the datasource is not available in the source. it means at the time of import of the transport request the job will check the data source of R/3 and if not available it gives the above error otherwise it will replicate and avtivate the data source.

    If it is in DEV system:

    yes , you need to replicate the data source. if you have done any changes in the R/3 side.

    it may help you

    Thanks and regards.

    Rambabu

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Murali,

      You were saying "You have to replicate the datasource from ECC and also transport the datasource replica from BW Dev to QA to PRD."

      Actually what this datasource replica really is ? Why do we need to transport this as well to QA and Production whereby we have already done the replication ?

      Thanks.

  • author's profile photo Former Member
    Former Member
    Posted on May 01, 2012 at 06:04 PM

    Hi

    System will take care of replication.

    You need not do replication after transport.

    But if the transport fails duw to Data Source replication problems better you replicate it.

    Regards

    Vishwatej

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.