Dear All,
In material master record, in basic data 1 view there is X plant material status tick. After clicking F4 on same it gives the options as "01-Block for procurement" and "BP-Block for purchasing". Can any one please explain the difference between these two.
In both the cases it is not allowing me create the PR & PO.
Regards,
Hi,
Is Blocking Key assigned to material master in basic data 1 view in X plant material status, if yes, remove blocking key and create PR & PO. Or check source list(ME01) is material blocked for procurement, if yes, remove it and save .Now go for creation of PR & PO of material.
The blocking keys(01-Block for procurement" and "BP-Block for purchasing), as you have, the
code and description may be different but properties are same and both are cause for same purpose which is not allowing you to creates PR & PO as procurement and purchasing both looks very much similar word as designed by your consultant!
You can find out both keys ( 01 and BP) details in following path , where Purchasing segment set B in field of. Purchasing msg.
SPRO > Logistics -General > Material Master > Settings for Key Fields > Define Material Statuses
Now as needed/required by you remove the Blocking Key 01 or BP and try to create PR & PO! So you are able to create PR & PO
NOTE:
But insetad of blocking procurement by using blocking keys, you can use source list(ME01) for creation of PR & PO of material.
Regards,
Biju K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Further information:
Material will be defined as per the product life cycle.The X-Plant status telling us where the item or material in the product life cycle.
Based on the definition and design of the materail in the life cycle we can defined the items as described below:
In general we have list of statuses and their meaning in the life cycle of the product
X-Plant status - Meaning of that number
01 - Obsolete
03 - Hibernate/standby
05 - Discontinue
10 - Concept
11 - Pending production
15 - Engineering model
20 - prototype
30 - o-series
40 - serial production
45 - project production
50 - specila production
55 - phase out
May be nubers will be changed as per their convinient and industry specific but the statuses of the items is same .
Hope this will help to understand the concept of X-Plant status.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
BLOCK FOR PROCUREMENT AND BLOCK FOR PURCHASING: That material is blocked for procurement if it is ticked . It depends upon business requirement, may be this material is internally produced or currently not in use etc.
THIS TICK WILL NOT ALLOW TO CREAT PO.
Un-tick that then you can create PR and PO.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
"01-Block for procurement" is Standard Setting
"BP-Block for purchasing". is Customize setting as per client requirement.
Both function are same.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
For some reasons your client configured this.
reasons could be
- some client dont want to use the standard keys as they always copy the standard keys and create a custom one.
- check in OMS4 for both keys, whether both are blocked only procurement or one key blocks both procurement and inventory(you can't post any inventory movements)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.