Hi friends ,
I have created a new order type for a plant and maintained following settings for cost display :
1) Maintained Value categories
2) Cost elements assigned to Val Categories
3) Assign Costing Parameters and Result Analysis keys
In the 3rd step , I have used Planned and Actual var cal. as standard "PM01"
After that I have created a spare with valuation class 3040(spares) and mentioned the Avg moving price as 2rs .After reserving this material in order , my planned cost is showing nothing .
Can you please guide what could be the reason