Former Member
Apr 11, 2012 at 06:38 PM

Stability Study - Frequency to create inspection lot

107 Views

Hi Experts,

We've created a strategic maintenance with 30 packages. The unit is day. I mean, package 1 = 1 day; package 2 = 2 day; package 3 = 3 day; package 4 = 4 day and consecutively... So we've used the CWBQM to assign the inspection plan to packages... For first operation were assigned package 1, package 2, package 5 and package 10. For second operation were assigned the packages 3, package 5, package 8, package 9. We've created the stability study using tcode QST01.

One inspection lot should be created for package 1 (first operation);

Another inspection lot should be created for package 2 (first operation);

Another inspection lot should be created for package 5 (both operation);

Another inspection lot should be created for package 8 (second operation);

Another inspetion lot should be created for package 9 (second operation);

Antoher inspection lot should be created for package 10 (first operation);

However, the system is creating inspection lots every day for both operation... I was wonder if you could inform me there is any tip or comment to solve this issue? or the standard system works this way?

I'd be glad to hear you.

Best Regards,

Valdevair