Skip to Content
author's profile photo Former Member
Former Member

Analysis Edition for OLAP with BPC Cube - Context

We have been trying to connect BOBJ Analysis Edition for OLAP (Voyager) 4.0 to several BPC 10 MS cubes. We are having problems bringing in the BPC Context (default) period into the Voyager reports. Has anyone else encountered this problem and solved it? If so, what is your solution?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Apr 30, 2012 at 04:51 PM

    In either BusinessObjects Voyager or Analysis for OLAP, it is not possible to display the BPC context.

    The BPC context is not an actual member contained in the backend cube but rather a shortcut to an intersection in the cube. The context is defined by the client application - in this case BPC for Excel or BPC for the Web.

    Voyager and Analysis for OLAP do not implement the concept of context therefore it can not be displayed.

    If this feature is important to you you may want to submit an enhancement request on the SAP Idea Place https://ideas.sap.com.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.