on 04-10-2012 5:36 AM
Hi,
The issue is thatwhen MRP is executed through batch Job PR is not getting generated automatically.The MRP is ececuted at Reorder point level.
I have checked all the parameters in MRP 1 view and MRP 2 view.The reorder point is 25 and stock maintained is 15 .Hence when MRP is executed
a PR of 10 units need to be executed.
I have checked config also.The plant is included in scope of planning file and MRP is activated for this plant.Please note The same program RMMRP000
is running well for other plant.
Please let me know if I am missing any configurations in Consumption based planning
Regards
Manash Das
Hi,
Check MRP Type and Lot Size (lot sizing procedure)!
In reorder point planning (type of consumption based planning) when you run MRP, the system will calculate the net requirement which is /are stock available at plant including any Safety Stock and outstanding Purchase Orders. If the sum of all these stock available is/are less than the reorder point, there is a material shortage and so MRP run create a purchase requisition according to the lot sizing procedure defined on the material master.
Regards,
Biju K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
- check that material in MD21 whether this material is included in planning file. if not add it through MD20.
- to ensure check the open PO and PR in ME2M and ME5A, If you are sure about no open PO and PR, check whats your maximum replenishment stock level? is it 15 or less. if yes, its not logical.. maximum replenishment stock should be above the reorder point. If its 15 or less system wont create the PR.
hi,
are talking about any specific material or entire materials under a plant.?
if it is for a specific material, then check whether a planning file entry has created for the material or not in MD21. if not do some material movement like goods issue to create a planning file entry and then run MRP. this should create a PR.
Regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for your reply.
In our case we are having reorder point planning
MRP Type-VB
Lot Size =HB
I have checked all the parameters
Total Stock=MMBE
Stock in Transit=mb5t
There is no outstanding PR or PO
Safety Stock=0
As per norms maintained in MRP the system should automatically generate PR after MRP run
The program name is RMMRP000(the batch job which is executed for MRP run) and the Tcode for the same is WC27
there might already be a PR or PO for 10 qty or more.
Regards,
Dakshesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.