Dear Experts,

We have recently upgraded our solution manager system from 7.0EHP1 to 7.1. In the System_Preparation activity under LMDB phase, we triggered the SLD to LMDB synchro Connection. The progress of this synchronization is stuck on 90% now. When checked under SLG1 tcode --> AI_LMDB object we see the below error

The lock on the instance 'LDB:0000000001' in client '' of the area 'CL_LMDB_MODEL_SHM_AREA' cannot be set because no active version exists. However, the area constructor was started to automatically b

Message no. BL001

After following note Note 1669645 - No progress during incremental LMDB synchronization the below error also showed up

Running sync job exists for namespace active but no related lock found

Message no. LMDB_CS_ERROR052

Has anyone faced this kind of error. The respective background job and the related work process is running.

Followed the below notes but no help.

Note 1555955 - SAP Solution Manager 7.1 - Performance Checks for LMDB

Can we 'Deactivate' and re-trigger the synchro using 'Activate' button?

Please provide some troubleshooting pointers.

Thank You.

Regards,

Prashant

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    Apr 09, 2012 at 10:12 AM

    hi,

    error saying Running sync job exists for namespace active but no related lock found seems already the batch job for LMDB sync is active, try to kill the job and run again,

    Thanks,

    Jansi

    Add comment
    10|10000 characters needed characters exceeded

    • Hi Prahsant,

      I would advise you to stop the job completely.

      In SETUP LMDB -> deactivate -> Delete -> and Configure Object Server again.

      Once done, let the sync begin and try to monitor the progress in SM37.

      See how it goes,


      Cheers

      Nicholas Chang

  • Apr 09, 2012 at 09:27 AM

    Hi,

    Have you update your CIM and CR_Content to the supported level?


    Cheers,

    Nicholas Chang

    Add comment
    10|10000 characters needed characters exceeded

  • Apr 09, 2012 at 11:25 PM

    Firstly ensure that you implemented the central note according with your SP level

    Solman 7.1 SP01 - 1552585

    Solman 7.1 SP02 - 1584162

    Solman 7.1 SP03 - 1613410

    Solman 7.1 SP04 - 1633725

    Implement the notes described in Section 2 that talk about manual steps.

    Check and apply these notes below.

    1700491    2    29    Diagnostics Prerequisites Check: Keine Zentralinstanz

    1669650    3    27    LMDB concept & troubleshooting in the LMDB setup guide

    1690804    1    27    Dual-Stack: Automatisches Anlegen des technischen Szenarios

    1683135    3    29    Systems disappearing from LAPI cache

    1669645    1    25    No progress during incremental LMDB synchronization

    1594654    3    29    LMDB Content Sync: Performance and Reference Numbers

    1664128    5    32    Incomplete data of technical systems in SolMan SLD

    1625376    3    36    SAP CR CONTENT update in SAP Solution Manager

    1632481    1    26    LMDB Configuration : Source and target system have the same object server name

    1572503    6    24    SAP Solution Manager 7.1 SP00 -> SP01: Manual Actions

    1511342    2    29    LMDB: No database is assigned to the technical system

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Tom Cenens