cancel
Showing results for 
Search instead for 
Did you mean: 

Fields in material master for PP

Former Member
0 Kudos

How are the following used?

planning time fence

reorder point

availability check and total replenish lead time

production sched profile

Approved batch record required

Batch management

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos
gyanaranjan_rout
Contributor
0 Kudos

1)Planning time Fence:You can protect the master plan from any automatic changes to master schedule

items in the near future by using a planning time fence. During the planning

run, the system makes no automatic changes to order proposals within the

planning time fence (which is specifically determined for every master schedule

item). The system always dynamically calculates the end date of the planning

time fence starting from the planning date.

2)reorder point:If stocks fall below the saftey stock

3)http://wiki.sdn.sap.com/wiki/display/ERPLO/Availability+checking+in+SAP

4)http://scn.sap.com/thread/1859263

5)http://scn.sap.com/thread/1806379

6)help.sap.com/printdocu/core/print46c/en/.../LOBM.pdf - United States