Preventive Maintenance Time

Former Member
0 Kudos

Dear All ,

greetings of the day,

from where i can find or enter  the actual time of any technical object that undergo Preventive Maintenance

Also in which table it get dtored

Rgds

Accepted Solutions (1)

Accepted Solutions (1)

peter_atkin
Active Contributor

When you complete the order/notification (TECO/NOCO) the maintenance plan is updated. You can also do this in IP10.

Have a look at the following maintenance plan tables: MPLA, MPOS, MHIS, MHIO

PeteA

Former Member
0 Kudos

Thanks For Your Reply

okie I can found Completion date and time in MHIO

but where i can found startdate and time

For example :

Order start date ( due )  is on 20.04.2012

and i start work on it today say 10.04.2012 11:00:00

i relase it today  and close it today sayt 10.04.2012  11:45:00

now i can found completion date and time in MHIO

but where can i found sart date and time

My objective is to calculate the time of prevetive maintenance  ie. 45 Minutes

Thanks

peter_atkin
Active Contributor
0 Kudos

The start time of what??

PeteA

HiteshMistry
Participant
0 Kudos

You can check order confirmation data, there is one option of entering operation wise start/end dates & time. Not sure whether it is useful for you,if useful check table AFRU.

Hitesh Mistry

Former Member
0 Kudos

Hope this is what you are looking for if you go to transaction IW47 this will display all the confirmations for your given selection criteria.

you can go to the settings and change the display to give you the start and finish dates and times for all the operations etc. You can also display the actual work and duration if this is what you require as the end result.

Jim

Former Member
0 Kudos

Hi

Start time means

When Actual Preventive Maintenance activity start on Equipment 

where we can enter it or find for collectively alll operation or you can say for order

peter_atkin
Active Contributor
0 Kudos

As per previous relies, you can look at the confirmation documents for the start of any labour work.

The actual start date/time cab be found in the order header on the Dates sub-screen. This data is stored in table AFKO-GSTRI and AFKO-GSUZI.

PeteA

Former Member
0 Kudos

ok fine

but here it is in display mode

how can it (AFKO-GSTRI and AFKO-GSUZI)be make editable

Thanks

peter_atkin
Active Contributor
0 Kudos

They are not editable. These fields are derived from the date/times on the confirmation documents.

Please give more details regarding your requirements.

PeteA