on 04-09-2012 4:47 AM
Dear experts,
I created a production order with one of the operation set as external process which automatically creates PR and thus can be referenced for PO creation. I have maintained the QM view of the material master of the Finished Goods by using MM02. The QM view of the Finished Goods produced includes the inspection type 0130 Receiving Insp. From External Processing. After the PR was created by the system, I created PO based on the PR. Then, I carried out the GR of the external process by using MB01. Unfortunately, an error message appeared and the inspection lot of 0130 type couldn't be created. Please give the solution for this problem. Thanks in advance.
Hi,
Please enter the inspection type to external operation parameters in production order operation detail view, then try again.
Regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.