Unable to create inspection lot during external process GR of a Production Order

Former Member
0 Kudos

Dear experts,

I created a production order with one of the operation set as external process which automatically creates PR and thus can be referenced for PO creation. I have maintained the QM view of the material master of the Finished Goods by using MM02. The QM view of the Finished Goods produced  includes the inspection type  0130 Receiving Insp. From External Processing. After the PR was created by the system, I created PO based on the PR. Then, I carried out the GR of the external process by using MB01. Unfortunately, an error message appeared and the inspection lot of 0130 type couldn't be created. Please give the solution for this problem. Thanks in advance.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Please enter the inspection type to external operation parameters in production order operation detail view, then try again.

Regards.

Former Member
0 Kudos

Hi thanks Ozgen for the reply. Points have been awarded