on 04-05-2012 5:18 AM
dear gurus,
i've the master data load to ods in process chain, which was in yellow status for long time, so turned the IP to red(we are working on bw). so i manually re ran the IP(usually used to take 1 hr) was running for 5+ hrs. so one of our colleague turned the request of ods to red. so please suggest me should i re-ran the IP again, by deleting the bad request from ods by turning it red.
or is there some other methodology for this
regards,
ratin
Hi Ratin,
1. Check the status of the job in SM37,
a) if its active, check the status of the job in application server (http://scn.sap.com/docs/DOC-25323)
b) if its canceled, try repeating the load.
2. Before repeating the failed IP, make sure you delete the red request after making the QM status red.
Hope this helps.
Regards
Sai
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ratin,
If the extraction job is not completed then try repeating the IP.
If extraction job is completed then, the Info Package is in yellow due to tRFC stuck.
If this is the case then you can sove the problem by clearing the tRFC's in the Source System.
Please go through the following link for furthur details which will completely solve your problem.
http://scn.sap.com/docs/DOC-26591
Hope this will solve your problem.
Regards,
Harish.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.