Hi All,
We want to introduce Reduction strategy in activity level for critical activities.
We have configured (Reduction up to level 3) and I’m able to see reduction strategy in network header and activity level, but system is not reducing duration in activities.
(Backward scheduling,Topdown)
Can anyone share the steps to be performed in project builder.
Thanks