Skip to Content
author's profile photo Former Member
Former Member

Problem with Switch

Hi all,

I am working on the following scenario DataBase To Global Data Store (another Data Base) and i am getting the response message from the Global Data Store.

Now I have to send the data to the SAP if the data is successfully entered in the GDS.In BPM I am checking the condition with switch step.If the response is success the data should go to SAP.

we applied SP09(SR1).I heared that there are some problems with swich step in sp09. If i implement with switch step i got an error like reciever not found.

Is there any other alternate solution to this problem.

Thanks,

Raghu

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on May 26, 2005 at 08:34 AM

    Hi,

    follow this xi forum thread..

    problem-with-switch-in-bpm

    thanks,

    sasi

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.