How to configure to enter confirmation control in po once PO is already released?

Former Member
0 Kudos

Hi,

I have given a confirmation control key in vendor master and prepare the PO with same vendor.

PO has been released and after that I got confirmation from vendor which i need to enter in PO.

I am not able to enter confirmation in PO because PO is already released.

Please confirm whether I need to unrelease the PO and then need to enter confirmation or is there any other configuration by which confirmation can be enter in PO without PO unreleased.

Regards,

Shri Prakash

Accepted Solutions (0)

Answers (0)