Hi,

I have given a confirmation control key in vendor master and prepare the PO with same vendor.

PO has been released and after that I got confirmation from vendor which i need to enter in PO.

I am not able to enter confirmation in PO because PO is already released.

Please confirm whether I need to unrelease the PO and then need to enter confirmation or is there any other configuration by which confirmation can be enter in PO without PO unreleased.