cancel
Showing results for 
Search instead for 
Did you mean: 

RFC Trust relationship no longer working after system migration

Former Member
0 Kudos

My enviroment 3 ERP 6.0 systems (DEV, QAS & PRD) and Solution Manager 4.0. All are on Oracle 10.2.0.2/AIX 6.1

Previously the systems were on Solaris 10 before migrating to AIX enviroment via a heterogeneous system copy. After the exercise I realised the following

1. Trust relationship between Solution Manager & the satelite systems is broken. The CUA (Solution Manager is the central system( used to rely on these RFC's

2. Early watch reports are no longer generated

Kindly advice how I can delete the trusted RFC's and regenerate from Solution manager transaction SMSY

Thanks & regards

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello,

If you want to recreate the RFCs, you can do that by going to SMSY, choose your system in change mode.

It will take you to LMDB, there you can maintain the RFCs.

Regards,

Sunny

Former Member
0 Kudos

From the look of things the Solution manager system landscape setup has to be deleted and reconfigured once more after the heterogenous system copy/migration

I've just realised in the technical details in landscape components (transaction SMSY) are for the previous servers/OS i.e. SUN/Solaris despite the fact that all SAP systems (DEV,QAS,Solution Manager & PRD) were migrated to IBM/AIX.

I would really appreciate guidance on how to remove entire system landscape from Solution Manager & how to reconfigure once more. Anybody who has gone through this after a system migration ?

Thanks

Former Member
0 Kudos