cancel
Showing results for 
Search instead for 
Did you mean: 

Activity price not showing in ck11n at history tab showing routing group

Former Member
0 Kudos

Activity price not showing in ck11n at history tab showing routing group how to analyze

Please help

Accepted Solutions (0)

Answers (4)

Answers (4)

rajneesh_saxena
Active Contributor
0 Kudos

Hi

Are you in S4 1511 environment?

Rajneesh

lalit_pawar
Explorer
0 Kudos

Check these points,

1. Ensure the lot size is valid for the costing lot size that is used in the CK11N input parameter.

2.Also ensure the routing status is 4 - release general and the usage is 1 - production(which can be

checked in CA03 for the product by going to the header details).

also check costing relevancy indicator in routing.

activity rate maintained in KP26

Regards

Lalit

Former Member
0 Kudos

Have you maintained Activity rate in routing. Also check activity rate maintined with cost center in T-code KP26

former_member198650
Active Contributor
0 Kudos

Hi,

Can you share screen of the same.

Regards,

Mukthar