Dear QM gurus,

any one can you please explain what is the importunes about version in master inspection characteristic creation.

i am totally confused please help me.

naren

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Best Answer
    avatar image
    Former Member
    Mar 07, 2012 at 12:02 PM

    In simple words,MIC is created as a Master data when you have same char used at several places.So you create it once & use it multiple time.

    Now in this process when you have a MIC which is slightly to be changed for certain parameters,so needs to create another version of the MIC which has some parameters different from the previos version.

    sap you have a MIC which is MIC1 version1 with UCL = 12 & LCL=10.

    Now you get a requirement to change limits of this MIC for a situation at one place(say UCL = 12 & LCL=10.50).

    As Version 1 is already used at sevaral places you may create New version say 2 and assign it to new place.

    Older one can be replaced with new one depending upon the customization"with History" & Without Histoty" .

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      If you dont want to create versions then deactivate the plant level setting of history of MIC (Remove the tick mark).

      Regards,

      Smruti

  • avatar image
    Former Member
    Mar 07, 2012 at 12:00 PM

    The version in MIC is used to track the changes in the MIC. But even after creating a new version if required still the old versions can be used in Inspection plan. What exactly do you want?

    Regards,

    Smruti

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Mar 08, 2012 at 07:11 AM

    thank u all,

    i am clear

    Add comment