cancel
Showing results for 
Search instead for 
Did you mean: 

importunes about version in MIC

Former Member
0 Kudos

Dear QM gurus,

any one can you please explain what is the importunes about version in master inspection characteristic creation.

i am totally confused please help me.

naren

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

In simple words,MIC is created as a Master data when you have same char used at several places.So you create it once & use it multiple time.

Now in this process when you have a MIC which is slightly to be changed for certain parameters,so needs to create another version of the MIC which has some parameters different from the previos version.

sap you have a MIC which is MIC1 version1 with UCL = 12 & LCL=10.

Now you get a requirement to change limits of this MIC for a situation at one place(say UCL = 12 & LCL=10.50).

As Version 1 is already used at sevaral places you may create New version say 2 and assign it to new place.

Older one can be replaced with new one depending upon the customization"with History" & Without Histoty" .

Former Member
0 Kudos

If you dont want to create versions then deactivate the plant level setting of history of MIC (Remove the tick mark).

Regards,

Smruti

Answers (2)

Answers (2)

Former Member
0 Kudos

thank u all,

i am clear

Former Member
0 Kudos

The version in MIC is used to track the changes in the MIC. But even after creating a new version if required still the old versions can be used in Inspection plan. What exactly do you want?

Regards,

Smruti