Hello All,
I have a Sales Order , with ITEM 10 XYZ (which is text material (does not have MRP views))
Below it ihave 2 items
20 pqr
30 abc
Both are assigned as SUB items to higher level item 10.
Part 2.
I now try to create a Production Order (co07),
When we create a PO for a Given Sales Order it normally
expands teh BOm item and creates a network of PO for Sub items. (Also allocating the Lead PO number under assignment Tab for child items).
Unfortunely in this case it does not behave like that , as it is not a BOM item (i.e 10).
If i want the same behaviour even in this case what all i need to do ..
F1 Please!!