Standard Cost change - MR21

For Material Master with price Control S was having stand cost run in the previous period, Now when we are going to change the price thru MR21 it is updating Moving Average price instead of Standard Price. It is also observed that for a material master with price control S and manual price maintained earlier in previous period and if we update price now thru MR21 it is updating Standard price.

Is there any config is there like for Material with price control S and manual price maintained then it has to update Standard Price, If cost estimate is there then it has to update moving price like that? Also let me know how to update standard price of a material thru MR21 with Cost Estimate .... Ramesh

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Mar 01, 2012 at 07:34 AM

    Hi Ramesh

    As for my knowledge in mr21 we are unable to change standard cost.

    you try for commercial price in t.code MRN9 with direct input for standard cost change in previous period.

    regards

    prakash

    Add comment
    10|10000 characters needed characters exceeded

  • Mar 01, 2012 at 09:08 AM

    Does your material has got split valuation.

    When u r entering material in mr21 it shows the price indicator for which the update will take place.

    check the input correctly and mention the valuation type if existing.

    Also note if future or current standard cost estimate is existing in material master then u cant change the price through MR21. Then u need to delete that price through CKR1 and then do MR21.

    Regards

    Divraj Agarwal