Using Upgrade Management Tool for Live to Live export

We tried doing a Live to Live export using the UMT from XI R2 to BI 4.0. It ran for 10 hours and then died somewhere around the Export Preparing stage, and we're working on the errors, but we're wondering if anyone has done a complete Live to Live export and how long it ended up taking.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 02, 2012 at 03:55 PM

    You ever complete the full Live to live?

    If so, what were some of the issues you worked through.

    We are doing the same migration and I am hitting a lot of errors along the way as well.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.