Inspection Lot Status UD ICCO SPCO ORRQ

Former Member
0 Kudos

Hello Experts,

Please share your thoughts on the System Status "UD ICCO SPCO ORRQ". Not sure on why the Lot getting the status ORRQ "Order record required"

What is the Condition in which the system triggers this Status? how to complete the inspection processing once we get this status? Is it a Particular Configuration setting that expects a Process Order Record?

Is there any setting in Production that sets the Inspection Lot status as ORRQ.

Appreciate your quick response.

Regards

Raja

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

hi,

Check ur MM- QM view whether QM order is assigned or not. if QM order is assigned then process your order and confirm it and provide the settlement also against that order. Or check any other order is opened against that lot or not Like PP order or PM order which is controlled by ur QM- status profiles.

once ur order closed technically ur inspection process completed.

Regards

former_member42743
Active Contributor
0 Kudos

QM order is not the same thing as order record.

Totally different.

FF

Former Member
0 Kudos

Hi

There is a Setting In Order Type Dependent Parameters which Requires an "Order Required"

This is not with the QM order settings in Material Master.

The Issue is resolved now.

Thanks

Solai

former_member42743
Active Contributor
0 Kudos

Please see my response to this in the PLM forum.

Please refrain from posting the same thread in multiple forums. One at a time please.

FF