Dear Gurus,

i have a issue in MD61,,i want to fill the daily requirement in such a way it should consider capacity .

means if we put 100 ea in daily requirement it should cosider capacity itf per day capacity is 80 ea system should show me the overload.

Siva

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Siva,

In standard SAP ,proposing or considering the capacity at the time of giving the independent requirements is not possible either

in MD61 or else during MRP run.

Even during MRP run the system does not checks the available capacity and it does not restrict the creation of planned orders

during overload situation.

Regards

Mangalraj.S

former_member212685
Participant
0 Kudos

Dear Mangalraj,

Please provide steps when we are going for SOP functionality.

Like rough cut profile .

Siva

dhaval_choksi3
Active Contributor

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi,

Feeding the information in MD61 will not create capacity. In order to consider capacity, after feeding the requirement in MD61. When you run MRP keep scheduling "2" lead time scheduling. So that planned orders will have capacity, you can see overload in CM01.

Regards / US

former_member212685
Participant
0 Kudos

Dear Gurus,

we would like to use SOP ,so what is the setting ,process flow with T.Codes .

kindly explain step by step process.

Siva

dhaval_choksi3
Active Contributor
0 Kudos

HI,

Another work around will be use of rough cut capacity planning. But for that you have to use SOP.

http://help.sap.com/saphelp_46c/helpdata/en/8a/a5905c4adc11d189740000e8322d00/frameset.htm

Regards,

Dhaval

former_member188931
Active Contributor
0 Kudos

Hi,

I would advise if you have to check the capacity planning based on daily requirement, then go for long term planning. This planning is simulation planning and it wont process the planned orders and purchase requisitions to the next level.

If you satisfy the result of long term planning then you can transfer to planned independent requirement for further normal activity.

Kindly go through the below link for long term planning,

[http://forums.sdn.sap.com/thread.jspa?messageID=7996085#7996085]

[http://forums.sdn.sap.com/thread.jspa?messageID=8895080#8895080]

Please check and revert.

Thanks

Hrishi

former_member186193
Active Contributor
0 Kudos

Hi,

As Mr. Mangalraj said the system will not check for available capacity while running MRP or doing MD61. What you can do is give a try how long term planning works and if it suits your requirement.

Regards,

Alok Tiwari