cancel
Showing results for 
Search instead for 
Did you mean: 

Two logical name in SAP Authentication

Former Member
0 Kudos

I have setup SNC on my BO development (BO XI 3.1 SP3) environment connecting to BDD. Is it possible to use same BO dev environment to connect to BQD.

Can I have two SNC setting in BO dev environment pointing to two different BW system (BDD / BQD).

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Yes, it's possible, follow the same procedure of SNC in BQD. But BO to create ALIAS, users might need to login manually using BQD SAP authentication once.

Former Member
0 Kudos

Thanks Arjun, I will try that.