cancel
Showing results for 
Search instead for 
Did you mean: 

Change batch level from plant to material

Former Member
0 Kudos

Hi,

is there any possibility to change the batch level from Plant to Material level. system has now changed the table in material master from MARA to MARC.

Regards,

Ali

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

hi,

Kindky refer the SAP note 41715 Resetting batch level from material to plant level

regards,

Lalita

uk_yelamuri
Contributor
0 Kudos