Skip to Content
0
Former Member
Feb 14, 2012 at 06:32 AM

Controlling Level At The Production Order Level

86 Views

Hi,

I want to set the ML controlling level to the production order level because I want to see the actual BOM used for each production order at the production order level. Since a different BOM may have been used for each production order (although the FG is the same) i must be able to see the actual BOM for each production order at the CKM3N screen.

However in the controlling level setting there is no way to set the controlling level up to the production order level. May i know why?