on 02-14-2012 3:00 AM
Hi,
Please tell me how can i verify that dep has been posted successfuly for the period. I find difference between dep run posted and its test run. I do not know why is it happening?
Hi:
In addition to above input you can see in table TABA whether dep was posted or not. AFBP will do the same thing also.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must have ran the dep test run in foreground, since for foreground, system can calculate dep for a maximum of 1000 assets only.
But actual run must be in background, so system will take all assets into consideration and posts the actual dep.
If you want to compare test run with update run, you should have ran the test run also in background mode only.
So you will get a spool request generated in SP02 for the test run too.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
check in AW01N in posted values tab it should match the test run value. see if there are any errors in the test run ?
regards
rohit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.