Hi All,

May i know how to create the rework order if that material have own general routing and i want to create the rework routing for all material at once will you give replay. i know the in routing control key is PP07 but i prepare the routing with FERT material in that the group counter will take from general routing. for that purpose how to create the rework routing.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Chakri,

First check in Tcode OPJF for the selection id a Priority is defined for the Task list type S with usage 1 and status 4 and then Proceed as follows:

1. Create a Reference op set in tcode Ca11.

Enter the plant,Description , usage and status for the ref op set Enter lotsize and unit of measure.

Enter the op as 0010 / workcenter/op control key/Description for the op Enter the standard values and save.

2. Create a Standard trigger point in CO31.(Ex Production)

Enter the Trigger Point usage /Group as FERT.

3. Tick the Trigger Point Functions.

4. Enable the indicator create order with Reference.

5. Enter the system status as PCNF.

6. Enter change as +.

7. Enable the indicator once.

8 . Now place the cursor on the create order with reference.

9. Goto Parameters.

10. In the Parameter enter in the group the created Reference op set group no.

11. Order type as PP01 and group counter as 1 and save the Trigger Point.

12. Now goto the Routing for your Material.

13. Choose the last op to assign the Trigger point.

14. Select the OP -


> Goto ---> Trigger Point overview.

15. Enter the Trigger Point usage as FERT.

16. Now choose that line ,select the Details---> Trigger Point f7. The system will says standard trigger point exists from which you can select the created Trigger Point (EXx Production)and save.

18. MD02/MD04.

19. Convert the Planned Order into Production Order and Release the order.

20. Now confirm th ops.

21. For the last op enter the yield and rework qty and set the status as PCNF.

22. If the status of last op is PCNF then in the system a POP UP will appear as Activited by Trigger Point /Create order with reference/order number/sequence and op number which trigger point works and enter.

These are the required steps to be maintained in re-work process

Hope it helps you.

Regards,

Madhu.G

former_member186193
Active Contributor
0 Kudos

Hello,

For the re-work order type maintain reference operation set so that you can assign it during creation of re-work order.

Maintain few reference operation using T. Code: CA11

Hope it is clear to you.

Regards,

Alok Tiwari

former_member183783
Contributor
0 Kudos

hi..

create a reference routing set.then assign this reference set to the re-work order..

former_member667328
Active Participant
0 Kudos

Dear,

Please find the attached link:

http://forums.sdn.sap.com/thread.jspa?threadID=1861125

Hope it may useful.

Thanks,

MS

Edited by: Mohit Sharma on Feb 13, 2012 5:34 PM