Goods movement in T code CO11N

Former Member
0 Kudos

Hi Experts,

When I was doing confirmation in T code CO11N , w.r.t operation 0010 in goods movement overview I got the movement type 261 for BOM materials and Movement type 101 for the Prod.order material. But I have not activated the backflush and selected the auto GR in control key and Production scheduler profile.

pls request to explain in details with reason for the movement type 261 and 101 in the goods movement overview of T code CO11N

with regards,

Anand

Accepted Solutions (1)

Accepted Solutions (1)

former_member186193
Active Contributor
0 Kudos

Hi,

It is not possible until you activate backflushing or auto GR.

Backflushing can be activated in

MRP 2 view

work center

Routing

Production order

Check all these area for backflushing.

For auto GR please check control key & SPRO T. Code" OPKP for your order type.

It will surely help you.

Regards,

Alok Tiwari

Former Member
0 Kudos

Mr.Alok,

I checked the backflush indicator activation in MRP View,Work Centre,Routing and Production order it is not there.

I have also checked for Auto GR indicator in control key used in routing and the Production scheduler Profile is is not activated,

Still I am getting the error.

Former Member
0 Kudos

Hi Anand,

Check the confirmation parameter in SPRO. you must have selected "Goods movement for all component" in "General Vaild setting" Tab

Answers (5)

Answers (5)

Former Member
0 Kudos

Answered, closed

former_member188931
Active Contributor
0 Kudos

Hi,

Check the order confirmation parameter(OPK4), tick mark on All components in General valid setting tab for plant and order combination.

Thanks

Hrishi

Former Member
0 Kudos

Dear P.P.ANAND,

First U go to t code OPK4 there U go to goods movement check all component is tick or not.If it is tick then only system will allow U all the component will saw in confirmation screen without backflux indicator.

Then go to OPKP check automatic Goods receipt indicator.If it is tick the un-tick this.

Then check UR routing control key for that particular operation.if it is PP01 or PP03.If it is pp03 change to pp01.Then go to OP00 select pp01 control key there untick auto GR.

I think it will help U.

Thanks

Alok Mohapatra

Former Member
0 Kudos

Hi

Check the confirmation parameter in SPRO. you must have selected "Goods movement for all component" in "General Vaild setting" Tab.

former_member211613
Active Participant
0 Kudos

Dear Sap User,

As you said you choosed the auto GR in control key this is the reason you are getting movement types 101 and 261.

These is no other reason behind this.

Rgrds,

Dheeraj rawal