Hello,
We currently have a functional location structure that has 4 levels:
XXXXX-XXXX-XXXXX-XXXXXXXX
1 2 3 4
The plant is in an evaluation stage to redo their functional location structure, there is a demand to create an additional level , so now a total of 5
They propose:
XXXXX-XXXX-XXXXX-XXXX-XXXX
1 2 3 4 5
(_Please note the current 4 level structure is only being populated at the 3 level so we do not have any functional location created at the 4 level.)_
Is this the correct process:
So if I go to t-code OIPK and change the structure to the new propose structure, will I get any issue.
Will I have to activate alternative labeling as well to let me change the structure.
Please advise.
Thanks,