Skip to Content
0
Former Member
Feb 10, 2012 at 08:27 AM

PI 7.3 and Netweaver BPM

60 Views

Dear PIers,

We are planning to upgrade SAP PI 7.0 to SAP PI 7.30 Dual stack version. We did not go to "Single Stack" since we did not want to migrate existing 400 interfaces to the single stack architecture at the same time and we wanted to migrate them one by one.

If we upgrade to SAP PI 7.30 Dual stack, will we be able to use the SAP Netwever BPM?. This will help us to make sure that we are one step ahead for migrating to single stack apart from migrating from ABAP based adapters to Java based adapters.

is anyone planning to go to PI 7.30 Dual stack and gradually migrate BPE based interfaces to SAp Netwever BPM before converting the dual stack PI to single stack PI 7.31?.

Regards