Dear All,
Kindly let me know how to configure the below requirements in SAP :
Before we raise the process order ,required Stock is transferred from main storage location to Production storage location through reservation(mb21).
If we are raising 10 process orders of 120 batches each batch will be of 20 kgs.We use the same raw materials with different qty in almost all the process orders produced in a day.
Here my concern is-
1) How can we have the track on the goods issued from main storage location to production storage location in SAP.
2)How to consolidate or add the same raw materials /components which are used in the process orders which are raised on the same day?(Do we need to develop any ZREPORT)
Kindly reply on this.
Regards,
Saritgopi.
hi
check the transaction MB51 with Movement types.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.