Skip to Content
0
Former Member
Feb 08, 2012 at 08:32 PM

Sequence of each method in data collection method

28 Views

Hi experts

We have a data transfer task that includes several methods (flexible upload, load from data stream, copy, delete, etc), we want the order of the methods as follows by modifyng the data collection method:

Data Stream     Data Collection Procedure         Method
Totals Records	Flexible Upload	                  CDU03
Totals Records	Copy	                          CDC01
Totals Records	Manual Data Entry	          GED01

But after saving the changes the sequence is changed, we go back to look at customizing ad the sequence shows this:

Data Stream     Data Collection Procedure         Method
Totals Records	Copy	                          CDC01
Totals Records	Manual Data Entry	          GED01
Totals Records	Flexible Upload	                  CDU03

Is there an additional logic we should consider?

Thanks in advance

Paul