You would need to open the report in the CR designer and do a 'Verify Database' (Database > Verify Database).
If the stored proc contains parameters, it will prompt for them. Make sure you enter them and hit OK.
You can also check the 'Verify Stored Procedures on first refresh' option under File > Report Options. This will make sure the report always presents the current version of the stored procedure.
-Abhilash
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Kiran and Abhilash
Didnt think of the Set database Location
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
open your report in desinger and select Database tab and select "Set Datasource Location"
Navigate to required Stored Procedure and click on "Update"
save the report to Enterprise.
Cheers,
Praveen G
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.