on 02-07-2012 2:14 PM
Hi All,
We assigned sampling procedure in quality plan,and lot is generated and sample is calculated correctly.
can i take sample with MVT 912 and do test for that sample?
Thanks.
Practically you should first post the stock in appropriate pocket via stock posting screen of Inspection lot then move the material as per you requirement.
There can be possibility to put the material in "sample usage" ( to do test for that sample) or block stock" or even in unrestricted & do the require movement.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
No. You can post the samples in the stock posting screen of the inspection lot.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.