PR Release strategy question- If there are 8 release codes

Hi,

PR release is based on :

1. PR document type: NB

2. PR creation indiactor: B,F,U

--> Release strategy 1, has 4 release codes from R1 TO R4.

--> Requirement is: Release pre-requisites to be designed in such a way that if any one code affects release, the PR should be changed from "BLOCKED" to " RELEASED".

How to design this?

--> Release strategy 2, has 8 release codes from M1 TO M8.

--> PR document type:NB

--> PR creation indicator: R

--> Requirement is: Release pre-requisites to be designed in such a way that if any one code affects release, the PR should be changed from "BLOCKED" to " RELEASED".

How to achieve this above scenarios?

Thanks a lot and hope I make sense!

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Feb 03, 2012 at 04:32 AM

    Configure your rel. prerequisities to allow this. Assign all 4 or 8 rel. codes in rel. stgy.

    While defining prerequisites do not tick R1 for R2,3,4 and same for R2, R3 and R4.

    Regards,

    Dakshesh

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      If you are not utilizing the feature of "Pre requisite", then I think you can have a single Release Code and give the authorization of the code to people.

      Other alternative could be to define a Release Indicator "Released" and Check it for "Released for Quotation" and "Released for issue of PO" and set this indicator in the Release Statuses for every Release Code.

      Hope this helps.

  • author's profile photo Former Member
    Former Member
    Posted on Feb 03, 2012 at 04:57 AM

    Hi,

    While creating characteristics select BSART(doc type) and creation indicator(ESTKZ) add this into your class.

    Then while creating Release strategy in the release staus tab maintain blocked if none of release codes released. For other codes maintain the Release status.

    Hope this will solve your problem.

    Regards

    Ravi Shankar.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 03, 2012 at 05:33 AM

    Basic question, can be easily searched in forum, try to do search first.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 03, 2012 at 06:05 AM

    Hi There

    1.In your release strategy- under the Release Pre requisite Tab- Enable for all the release codes (First Box only) means that no need to go with the order can release by any one-

    2. Under the release Statuese tab- Mention the Released Indicator instead of Blocked

    Thanks

    Senthil P

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.