Skip to Content
author's profile photo Former Member
Former Member

Unable to change Batch Classification Status from 'Incomplete' to Released

Hello,

I am unable to change the Batch Classification Status from 'Incomplete' to Released for a batch master record. I have checked to make sure that batch classification status is active for the plant and that required characteristics are populated, yet everytime I change the status to 'Released' and then save, the status doesn't change from incomplete.

Your suggestions would be most appreciated.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Feb 03, 2012 at 09:31 AM

    Hi,

    Batch classification status: it can be changed by selecting clicking on the appropriate status and save. Pl check and see. Please follow this link: http://help.sap.com/saphelp_erp60_sp/helpdata/en/25/28428b4f7811d18a150000e816ae6e/frameset.htm

    Regards, KrishnaM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.