Skip to Content

Internal Order Budget check while asset procurement through PR or PO

Hello Experts ,

Hope this is the correct place to post my issue!!

I have created the IO- KO01

Assign Budget - KO22

Activated tolerance limit and availability control and released the IO

status of IO is- REL AUC AVAC BUDG

Now, i want to create the PR/PO for this IO. Please tell me the process ahead ie. which a/c assign category is to be used,what document type is needed etc.

Please Also , suggest what are the other things/configuration needed for the same i,e. G/L assignment or Cost Element creation.

Please help experts.

Regards,

Ankur

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Feb 02, 2012 at 08:05 AM

    hi

    the account assignment should be "F" Order.

    and you have to assign the created internal order.

    also make sure that secondary cost element to be created for the budget monitoring/control.

    material master should have correct valuation class.

    OBYC Automatic determination setting

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.