Adjusting the behavior of sales unit of measure on sales order

Hello Everyone,

I have a question regarding adjusting the behavior of sales unit of measure (UOM) on sales order (SO).

We maintain 3 UOM on material master u2013 A, B, C; where A is base UOM and C is sales UOM.

If we change the material on existing sales order in VA02, system also always changes the UOM on SO to C as well because C is sales UOM on material master. Sometimes SO quantities are in A or B UOM and we do not want system to change them to C when material is updated.

We know it is a standard SAP behavior and the question is if it can be adjusted somehow (in configuration or some other way), so system is not changing the UOM on existing SO to sales UOM when material is updated.

PS if we leave sales unit of measure field in material master blank, when material on SO is changed system is still changing the UOM, now to the base UOM A

Thank you!

Alex

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Feb 02, 2012 at 03:42 PM

    ANSWER: According to SAP there is no way to change the behavior without taking the risk of breaking a lot of stuff.