Change the inspection stock of material xxx in QM only - Movement type 101

Dear all,

I have searched in this forum about the subject issue several times and none of the threads are clearly explaining about this error for the movement type 101. That's why I am raising this issue.

Now my scenario is when I try to receive any material be it Raw material or Finished Product through transaction MIGO or CO11n, system is not allowing me to post the goods. It is giving the error 'Change the inspection stock of material xxx in QM only'.

Please advise.

Regards,

R.Ponniah

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2012 at 09:25 AM

    Its simple,When have a Inspection type 01 or 04 active & if you try to post the material to "unrestricted " instead of "quality stock" system gives such error.

    This also happens if you use non QM t codes like MB1B or MB01 etc for posting.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2012 at 09:12 AM

    Hi normally this happens when you try to reverse/ Cancel the document or try to move material from quality to unrestricted through MB1A. You can check if you have auto GR activated for at the time of confirmation and 04 inspection is activated in material master. which is moving the material to quality. But in any of the case it should not give error for 101 movement type. Please let us know for which mvmt type it is happening

    Regards,

    SMruti

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      We are using 101 movement type only for GR. But system is not allowing GR for both Raw material as well as finished product.If I remove the tick mark from 'Post to Inspection Stock' in the inspection set up of material master, then GR happens. But Inspection lot is not getting generated which I don't want.

      Please advise.

      Regards,

      RP

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.