Skip to Content
0
Former Member
Jan 27, 2012 at 06:00 AM

E613 SYST: You cannot determine the period for rule IT to 27.01.12

4613 Views

Dear All Experts,

I am facing below error while creating asset via AS21 ( Group Asset ) for Income Tax BLOCK purpose.

E613 SYST: You cannot determine the period for rule IT to 27.01.12

For this I searched forum , got similar threads replied but not solved. I went through the threads and and performed the steps but didn't luck any more still facing same issue.

The steps I followed :

1 ) I performed OA84 for generating period control rules. Where I didn't found rule IT there. I dont know why SAP didn't came with rule IT.

2 ) Second I read the SAP Note 357345 it is directing to generate the rule at own in OAVH for not defined rules. I don't understand what logic to follow to configure this element in OAVH ?

3 ) I checked in AFAMP my period control method which is used in AFAMA is IN1 and presented in AFAMP also. With following details :

IN1

Period control method for IT depreciation - India

IT

IT

NL

NL

Then how SAP saying that correct rule IT ? Although there is no description given for IT.

Basically I am dealing with Income Tax Depreciation for Indian company code. And I don't understand how to achieve half yearly depreciation concept. If anybody has gone through this earlier for Indian company code please guide or provide some inpurts to head start. Guidance will be really appreciable.

Regards,

Sharvari Joshi.

P.S. : I recetly gone through this [SYST: You cannot determine the period for rule 02 to 31.01.10|; and where Bernhard saying that ANLB-PERFY should be 24 in my case it is 12, so where should I change this to 24, I mean which to T.code to use ?

Edited by: Sharvari Joshi on Jan 27, 2012 11:36 AM